S/4HANA Extended Production Engineering and Operations (PEO) Part 2 – Basic End to End Flow

MAN Production Planning (PP), MM (Materials Management), PLM Project System (PS)

Introduction This blog continuation to previous one – S/4HANA Extended Production Engineering and Operations (PEO) Part 1 – Configuration Settings Production engineering strives to bridge the gap between manufacturing and design engineering by providing seamless process flow and a more detailed process plan definition. Production Engineering and Operations module delivered to an extension of standard […]

Continue reading


S/4HANA Extended Production Engineering and Operations (PEO) Part 1 – Configuration Settings

MAN Production Planning (PP), MM (Materials Management), PLM Project System (PS)

Production Engineering and Operations module delivered to an extension of standard Production Planning to cover the Engineering and Shop Floor Operations during the shop floor execution. SAP was not delivered the best practices to understand and implement this module in the market, so this blog covers the basic configuration required to execute end to end […]

Continue reading


Demand Driven MRP in S/4HANA (DDMRP) – Use Cases

MAN Production Planning (PP), SAP S/4HANA

In this blog will give you detailed understanding of the below points in DDMRP in S4HANA. 1. Decoupled Lead Time (DLT)2. Buffer Zones Calculations, ADU Value & PIR’s Impact.3. Sales Orders impact on buffer calculation and qualified spike. Also Read: https://www.erpqna.com/sap-s-4hana-production-planning-and-manufacturing-certification/ 1. Decoupled Lead Time (DLT): The sum of the longest lead times of non-buffered […]

Continue reading


Batch management new logic from S/4 HANA 1809. Batch management indicator (Plant)

EWM - Basis, EWM - Interfaces, EWM - Master Data, MAN Production Planning (PP)

With the introduction SAP S/4HANA 1809, SAP provides a more flexible solution in batch management. A new feature has been introduced as a new field in material master, batch management required indicator(Plant). Business can activate the batch management for materials (batch level = material) but deactivate the batch management at plant level. This functionality has […]

Continue reading


Application set-up and basic understanding of DDMRP designed for SAP S/4HANA On-Premise

MAN Production Planning (PP), SAP S/4HANA

Introduction This blog is meant to be a guide to step through the configuration and execution of Demand Driven MRP for S/4HANA On-Premise. This overview based on S/4HANA 1909 (and, to some degree, for S/4HANA Cloud 1911 and On-Prem 1809). Read More: https://www.erpqna.com/sap-s-4hana-production-planning-and-manufacturing-certification/ There is also a DDMRP application that has been designed for SAP […]

Continue reading