EWM Inspection lot generation & Processing of EWM inspection lots in S/4 HANA 1809

PLM Quality Management (QM)

1. Purpose: This blog explains the process of inspection lot generation for EWM inspection types, Result recording, Usage decision and limitations for EWM inspection types in S/4 HANA 1809. 2. Introduction: As discussed in earlier configuration doc, we must do relevant configuration for QM with EWM integration and, we must activate the inspection types for […]

Continue reading


Results Confirmation- Control indicators in MIC

PLM Quality Management (QM)

Purpose: The purpose of blog to explains about purpose control indicators of result confirmation in MIC. Also Read: SAP QM Certification Preparation Guide Here we will discuss about control indicators Like Required charc Optional Charc After Acceptance After Rejection Required Charc: If inspection characteristic is must to record the results then we must choose “Required […]

Continue reading


Auto updation of QM Inspection results to Batch Characteristics to calculate Potency

PLM Quality Management (QM)

Purpose: The Purpose of this blog to provide step by step procedure to auto update the Inspection results values to batch characteristics. Introduction: Most of PP/QM consultant get the requirement to update the QM inspection results to batch characteristics, especially when they work for Pharmaceutical projects. To Perform MQC, QM inspection results should be updated […]

Continue reading